SUBJECT: URGENT – Request for Immediate Storm Drain Gate Review and Community-Wide Flood Prevention in Mission Beach

Dear Mayor Gloria, Councilmember Campbell, and City Leadership,

On behalf of the Mission Beach Town Council (MBTC), we request immediate action to address recurring flooding throughout Mission Beach, particularly near San Gabriel Place and Mission Boulevard in South Mission Beach.

Residents report flooding in several areas when storm drain gates remain closed, even when conditions may allow water to drain. These reports raise concerns about how the City's storm drain gates are operated and whether current procedures are adequate.

The flooding between October 26 and 29, 2026, highlights the need for better coordination, clear operating procedures, and immediate flood prevention measures while permanent improvements are still years away.

With additional high tides expected in November and December, residents and businesses need protection now.


1. Problems with the Existing Drainage System

The City has acknowledged that parts of Mission Beach's storm drain system date back to the 1940s and have limited drainage capacity.

The City's South Mission Beach Storm Drain Replacement and Green Infrastructure project includes System 5, which serves San Gabriel Place. Construction is currently scheduled for September 2028 through May 2029.

Residents understand that the automated storm drain gate at San Gabriel Place is not working properly and currently requires City employees to operate it manually.

We request written confirmation of:

  1. The gate's current operating condition.

  2. Whether its automatic controls are working.

  3. How and when City employees are instructed to open and close it.

  4. When reliable automatic operation is expected to be restored.

Gate operations are especially important during high tides and rainfall. Opening a gate when bay water levels are too high could allow water to flow back into streets. However, keeping a gate closed when water levels allow drainage could cause flooding to last longer.

The City needs clear, engineering-based procedures to balance these risks.


2. Flooding During October 26–29, 2026

South Mission Beach experienced significant coastal flooding between October 26 and 29.

The National Weather Service San Diego issued a preliminary storm report on October 26, 2026 (Report No. NWUS56 KSGX 261831). It documented flooding near San Rafael Place at approximately 9:20 a.m.

The report describes video showing Mission Bay water flooding San Rafael Place and reaching Mission Boulevard, with water depths ranging from ankle to knee deep.

Although this report documents flooding near San Rafael Place rather than San Gabriel Place, it confirms that significant flooding occurred in South Mission Beach.

NOAA also reported record-setting coastal water levels in California in its November 4 publication, California Water Levels Break Records. These conditions were associated with unusually high astronomical tides, El Niño-related ocean conditions, and warmer ocean temperatures.


3. Reports of Flooding Near San Gabriel Place

Residents also reported significant flooding near San Gabriel Place and Mission Boulevard during this period.

The flooding reportedly affected access to Mission Market and nearby businesses.

Community members further report that the storm drain gate remained closed during flooding and that standing water drained within approximately 15 minutes after City employees manually opened it.

The exact date and time of this reported gate opening have not yet been independently confirmed.

If verified, this raises an important question:


Could better monitoring and more timely gate operations have reduced the amount of flooding or how long it lasted?


We understand that opening the gate is not always safe. Actual bay water levels, drainage system levels, rainfall, and engineering conditions must all be considered.

We therefore request a review of the City's gate-operation records, staffing, water-level information, and decisions made between October 26 and 29.


4. Flooding Is a Community-Wide Problem

Although San Gabriel Place is a particular concern, residents report flooding in other parts of Mission Beach as well.

The city should not investigate these problems one location at a time. It should review all storm drain gates and tidal backflow prevention systems throughout Mission Beach.

This review should identify:

  1. Which gates are working properly.

  2. Which gates require manual operation.

  3. Whether similar problems exist at other locations.

  4. Whether delayed gate operations contribute to flooding.

  5. Which areas flood because of limited drainage capacity, high groundwater, or other infrastructure problems.

A coordinated, community-wide plan is needed.


5. Immediate Actions Requested

The Mission Beach Town Council requests that the City take the following six actions:


1. Establish written gate operating procedures.

Create clear procedures for opening and closing the San Gabriel Place gate and all other manually operated storm drain gates in Mission Beach.

Decisions should consider:

  1. NOAA tide predictions and actual bay water levels.

  2. Weather and rainfall forecasts.

  3. Water levels within the drainage system.

  4. Engineering guidelines for safe gate operation.

The City should identify who is responsible for making these decisions and establish emergency procedures.


2. Assign City personnel during high-risk periods.

Assign trained employees to monitor conditions and operate gates during predicted high tides, rainfall, and other potential flooding events.

Establish staffing schedules, backup personnel, and after-hours coverage so that gates can be operated when needed.


3. Keep detailed operating records.

Record:

  1. When each gate is opened and closed.

  2. Bay and storm drain water levels, when available.

  3. Tide and weather conditions.

  4. Which employees made operating decisions.

  5. Why the gate was opened or closed.

  6. Whether flooding improved after the gate was operated.

After significant flooding events, review these records to identify what worked and what needs to change.


4. Keep residents and businesses informed.

Provide regular updates to the Mission Beach Town Council, residents, and businesses about:

  1. Gate conditions and repairs.

  2. Flooding incidents.

  3. Operating procedures.

  4. Temporary flood prevention measures.

  5. Progress on permanent infrastructure improvements.

The city should also explain what happened during October 26–29, including when the San Gabriel Place gate was opened and closed and why those decisions were made.


5. Speed up permanent infrastructure improvements.

Review whether the South Mission Beach Storm Drain Replacement project, particularly System 5, can be completed sooner.

Confirm whether automatic, sensor-controlled gates are included in the project and when they will be operational.

Also consider temporary repairs, water-level sensors, remote monitoring, and other improvements that could reduce flooding before construction is completed.

Residents should not have to wait until 2028–2029 for better flood protection.


6. Inspect all storm drain gates throughout Mission Beach.

Complete a community-wide inspection of storm drain gates and tidal backflow prevention systems.

Provide the Town Council with:

  1. A list of all gates and drainage structures.

  2. Their current operating condition.

  3. Whether they are automatic or manually operated.

  4. Their maintenance and repair needs.

  5. The city departments responsible for them.

  6. A plan and timeline for addressing problems.





6. Records and Written Information Requested

To better understand the flooding and work toward solutions, we request copies of the following information:

  1. Confirmation of the current condition of the San Gabriel Place gate and any problems with its automatic controls.

  2. Existing gate operating procedures and engineering guidelines.

  3. Maintenance records and operating logs for Mission Beach storm drain gates.

  4. Gate operating and staffing records from October 26–29, 2026.

  5. Available bay water-level, stormwater-level, and rainfall data from those dates.

  6. Identification of City departments responsible for operating, monitoring, and maintaining the gates.

  7. A written review of the October 26–29 flooding and whether gate operations affected its severity or duration.

  8. The current scope, funding, and construction schedule for System 5, including plans for automatic gate controls.

  9. A complete list of storm drain gates and tidal backflow prevention systems throughout Mission Beach.

  10. A timeline for implementing temporary flood prevention measures and improved gate operating procedures before the next high-risk tide periods.


We request a written response within five business days identifying the responsible City departments, immediate protective measures, and the timeline for addressing these concerns.


7. Immediate Action Is Needed

Mission Beach is especially vulnerable to flooding because of its coastal location, high tides, rainfall, and aging drainage infrastructure.

The October 26–29 flooding demonstrates the need for better monitoring, reliable equipment, and clear responsibility for storm drain gate operations.

We recognize that managing these gates involves difficult decisions and that opening them at the wrong time can create additional flooding risks. We also appreciate the city employees responsible for maintaining this infrastructure.

However, residents and businesses deserve confidence that these decisions are based on accurate information, established engineering standards, and clearly defined procedures.


Mission Beach needs a reliable, community-wide flood prevention plan now—not just the promise of infrastructure improvements several years from today.


With additional elevated tides expected in November and December, we urge the city to take immediate action.

We look forward to receiving your written response within five business days and working with City leadership and the Stormwater Department to put effective flood prevention measures in place.


Sincerely,

Larry Webb

President

Mission Beach Town Council



Supporting Documentation

Enclosure A – National Weather Service Preliminary Local Storm Report (October 26, 2026)

Report No. NWUS56 KSGX 261831, documenting coastal flooding near San Rafael Place in South Mission Beach.

Enclosure B – NOAA Coastal Water-Level Report (November 4, 2026)

California Water Levels Break Records.

Enclosure C – City of San Diego Storm Drain Replacement Project

South Mission Beach Storm Drain Replacement and Green Infrastructure Project.



 
 
MBTC LOGO FINAL-01.png

About US

The purposes of this council are to provide a forum for discussion of community issues; to strive to reach all members of the community and communicate their views to the appropriate governmental officials and agencies.

 

Read More

Join My Mailing List

Thanks for submitting!

Mission Beach Town Council, PO Box 9842, San Diego, CA 92169      communication@missionbeachtc.com 

© 2022 MISSION BEACH TOWN COUNCIL INC a California 501(c)(4) Corporation.  Created by generous sponsorship of the Felice Agency.

bottom of page